| Ian chipping concrete from a former ...... |
![]() |
| ..... & Steve oiling it to reduce concrete sticking & giving a poor finish |
![]() |
| Decanting the first load of concrete into the dumper |
![]() |
| Wet rails & sleepers making steering awkward |
![]() |
| Tipping to waiting Steve ..... |
![]() |
| ..... who spreads the load inside the former |
![]() |
| John vibrating |
![]() |
| Ian & Steve topping out a former |
![]() |
| John still removing air pockets |
![]() |
| Ian levelling the top |
Colin & Bill painting East Tanfield station exterior walls
![]() |
| Geoff stirring paint for his team |
![]() |
| Colin at full stretch on a gable |
![]() |
| Geoff unblocking a down pipe |
![]() |
| Steve & Ian preparing part of the main platform for concreting |
![]() |
| Removing top shutter & covering ducting for a water pipe |
![]() |
| Removing shuttering without damaging the face |
![]() |
| The finished bay copings |