![]() |
| Colin continuing with the wainscot in the welcome building ..... (photo courtesy of Geoff Lowe) |
![]() |
| ..... followed by Geoff with his paintbrush (photo courtesy of Geoff Lowe) |
![]() |
| Ian cutting off rails to the wheel lathe |
![]() |
| Dave watching Ian cut off the shed water valve, to replace gaskets & stop leaks |
![]() |
| Steve chipping rust from the valve face |
![]() |
| Dave making a rubber gasket for the valve |
![]() |
| Tom working on a sight feed lubricator for HL No.2, which is going to Embsay for a short holiday |
![]() |
| Ian shovelling more rubble from the floor near the front of MH shed |
![]() |
| Ian waiting to be loaded |
![]() |
| I'm cutting a straight edge on the concrete floor to be kept, with Steve watering (photo courtesy of Dave Dixon) |
![]() |
| Ian dressing off the cut |
![]() |
| Steve & Dave removing forge ironwork ..... |
![]() |
| ..... so that Ian can break up the last large section of floor |













No comments:
Post a Comment