ORR Visit
Today the ORR inspector came to inspect the physical side of the railway, this was a detailed walk of the railway. The result is that there was nothing flagged up that we did not know about, and that the planned work in the near future should bring the railway up to scratch. More news of the proposed work will be posted soon.