We removed the remaining 75 lb/yd FB panels at Boyd's crossing today.   Tomorrow we should be able to start laying the replacement 109 lb/yd FB panels.

Chris, Bill, Ian and Sarah unfastening today's first panel
Chris, Sarah and Bill steady a panel.   With no slewing room,
the panels were taken back up the bank
Another panel being disconnected and slung
Sarah checking a sling
Bill and Chris removing fishplates
Sarah and Ian slinging (beside Boyd's hen crees)
Malcolm demonstrating his persuasive side
We'll have the crossing to remake
Most panels were slewed directly onto a waggon
behind, then removed at Marley Hill
Vic preparing the bed as we move up the bank
The last 75lb panel being removed .....
..... followed by the short 95 lb closure panel

Volunteers are always welcome, especially to help us progress this type of work over the next few weeks.

Meanwhile, back in the workshop .....