Mark checks his fire on 178. |
... As Does Sarah on HL no2 |
As Danny checks the water level On Cochrane. |
Tom Oils up 178. |
And Dan Cleans. |
At Andrews House: HL no2 Crew Chill. |
... As Cochrane's Crew Coals + Water. |
Meanwhile: David drives AW2... |
...On a Return train from Sunniside With 178. |
At Causey: Dave cuts the grass. |
178 and Cochrane lead out of Causey. |
Chris (guard) and Adam (ticket collector) watch the train out of Causey. |
George attaching HL no2 to its train at Causey. |
Cochrane Returns and performs the Shunt and release... |
...So Mark can Attach 178 to the north end And take over the train solo. |
train then Departing. |
HL no2 Now performing the Shunt... |
... So Cochrane can be released. |
Cochrane leads the train into Causey (with HL no2 at the rear). |
Cochrane's Crew coaling up again. |
... As 178 passes them at Andrews House. |
178 then arrives at Causey. |
Crew Break at Causey. |
End of Day: George preparing to shunt the Pipe Waggon... |
...Whilst Dan cleans out 178's Smoke box... |
... Danny on Cochrane's smoke box... |
... As Steve cleans Cochrane's ash pan. |