| Mark checks his fire on 178. |
| ... As Does Sarah on HL no2 |
| As Danny checks the water level On Cochrane. |
| Tom Oils up 178. |
| And Dan Cleans. |
| At Andrews House: HL no2 Crew Chill. |
| ... As Cochrane's Crew Coals + Water. |
| Meanwhile: David drives AW2... |
| ...On a Return train from Sunniside With 178. |
| At Causey: Dave cuts the grass. |
| 178 and Cochrane lead out of Causey. |
| Chris (guard) and Adam (ticket collector) watch the train out of Causey. |
| George attaching HL no2 to its train at Causey. |
| Cochrane Returns and performs the Shunt and release... |
| ...So Mark can Attach 178 to the north end And take over the train solo. |
| train then Departing. |
| HL no2 Now performing the Shunt... |
| ... So Cochrane can be released. |
| Cochrane leads the train into Causey (with HL no2 at the rear). |
| Cochrane's Crew coaling up again. |
| ... As 178 passes them at Andrews House. |
| 178 then arrives at Causey. |
| Crew Break at Causey. |
| End of Day: George preparing to shunt the Pipe Waggon... |
| ...Whilst Dan cleans out 178's Smoke box... |
| ... Danny on Cochrane's smoke box... |
| ... As Steve cleans Cochrane's ash pan. |