Eric measuring for noticeboards |
Kyle filling Horden's frames for painting |
Jack measuring for future refitting Horden's cab |
Alan & Brian drilling a brake hanger boss for Horden |
Jim setting up a job for Horden |
Barry making another fitted bolt |
Peter sketching work for Horden |
Brian & Alan figuring how to fix Horden's tubeplate to the bed of the radial arm drill, prior to tapping for wash out plugs |
Dennis giving Eric a hand with a sign |
Ian coaling Twizell to help Kyle raise steam |
Kyle in control (photo courtesy of Ian Cowan) |
Vic cutting the bankside by the car park |
Angela about to move No.2 with No.2 |
Ian bringing Twizell back from tests |
No comments:
Post a Comment