Works train passing Causey Level Crossing |
Dave doing final preparation on the formers at East Tanfield |
The concrete has arrived - first dumper load |
Steve, Dave & Ian filling a former |
Shovelling into the second former |
Steve joining in at the back |
Bill vibrating air out of the concrete |
Levelling off |
Later, removing the cover sheet from the Cotherstone carriage |
Preparing to cut more reinforcement mesh |
No comments:
Post a Comment