![]() |
| Works train passing Causey Level Crossing |
![]() |
| Dave doing final preparation on the formers at East Tanfield |
![]() |
| The concrete has arrived - first dumper load |
![]() |
| Steve, Dave & Ian filling a former |
![]() |
| Shovelling into the second former |
![]() |
| Steve joining in at the back |
![]() |
| Bill vibrating air out of the concrete |
![]() |
| Levelling off |
![]() |
| Later, removing the cover sheet from the Cotherstone carriage |
![]() |
| Preparing to cut more reinforcement mesh |










No comments:
Post a Comment