![]() |
Works train passing Causey Level Crossing |
![]() |
Dave doing final preparation on the formers at East Tanfield |
![]() |
The concrete has arrived - first dumper load |
![]() |
Steve, Dave & Ian filling a former |
![]() |
Shovelling into the second former |
![]() |
Steve joining in at the back |
![]() |
Bill vibrating air out of the concrete |
![]() |
Levelling off |
![]() |
Later, removing the cover sheet from the Cotherstone carriage |
![]() |
Preparing to cut more reinforcement mesh |
No comments:
Post a Comment