Fitting the fixed back to the digger to form a grab with a bucket |
Around MH curve, sorting out sleepers & other materials ..... |
..... including a buffer stop removed from Sunniside a few years ago |
Steve removing some of the undergrowth to help with identifying & moving materials (photo courtesy of Dave Dixon) |
Ian salvaging beams from a roof panel (photo courtesy of Dave Dixon) |
Finding useful materials such as scaffold poles (photo courtesy of Dave Dixon) |
Sorting rail (photo courtesy of Dave Dixon) |
Terry painting a metal strap (photo courtesy of Geoff Lowe) |
Colin measuring for replacement of the porch at Andrews House (photo courtesy of Geoff Lowe) |
Dave working on the same job (photo courtesy of Geoff Lowe) |
Barry fitting a replacement fascia (photo courtesy of Geoff Lowe) |
Dave moving hanging baskets (photo courtesy of Geoff Lowe) |
Colin & Terry fetching wood to replace a station bench (photo courtesy of Geoff Lowe) |
Colin measuring for rebuilding the seat (photo courtesy of Geoff Lowe) |
Geoff on the seat repair job (photo courtesy of Geoff Lowe) |
Colin tidying up (photo courtesy of Geoff Lowe) |
Martin uncovering rail at MH curve |
Save & Ian salvaging more timber |
Stacking rail & point components |
Moving chairs away from MH curve |
Handling one of the buttresses temporarily used to hold MH shed front gable in 2014 |
No comments:
Post a Comment