| Jonny coaling Horden |
![]() |
| Nigel, Martin & Colin discussing work at Andrews House |
![]() |
| Ian setting out a bed of sleepers on which to invert HC 38's boiler |
![]() |
| HC 38's boiler standing on the pad |
![]() |
| Ian installing the pin holding the back grip on the digger |
![]() |
| Ian & Richard moving the concrete beams on which the boiler will be cradled |
![]() |
| Spinning the boiler for better use of space & pad - note the 12 x 12 to be used for turning |
![]() |
| Onto its side first ..... |
![]() |
| ..... & using the 5 road shed to get the boiler upright |
![]() |
| Heading into the cradle with the dome between the beams |
![]() |
| In position with the firebox upside down to facilitate further work & removal |
![]() |
| Nigel removing an inward opening door at AH waiting room (photo courtesy of Geoff Lowe) |
![]() |
| Colin tidying up the ground around the toilets (photo courtesy of Geoff Lowe) |
![]() |
| Nigel & Martin resetting a door to be outward opening (photo courtesy of Geoff Lowe) |
![]() |
| Terry & Konnor painting the bookshelves (photo courtesy of Geoff Lowe) |
![]() |
| Colin & Martin adjusting the fit of the door (photo courtesy of Geoff Lowe) |