![]() |
Jonny coaling Horden |
![]() |
Nigel, Martin & Colin discussing work at Andrews House |
![]() |
Ian setting out a bed of sleepers on which to invert HC 38's boiler |
![]() |
HC 38's boiler standing on the pad |
![]() |
Ian installing the pin holding the back grip on the digger |
![]() |
Ian & Richard moving the concrete beams on which the boiler will be cradled |
![]() |
Spinning the boiler for better use of space & pad - note the 12 x 12 to be used for turning |
![]() |
Onto its side first ..... |
![]() |
..... & using the 5 road shed to get the boiler upright |
![]() |
Heading into the cradle with the dome between the beams |
![]() |
In position with the firebox upside down to facilitate further work & removal |
![]() |
Nigel removing an inward opening door at AH waiting room (photo courtesy of Geoff Lowe) |
![]() |
Colin tidying up the ground around the toilets (photo courtesy of Geoff Lowe) |
![]() |
Nigel & Martin resetting a door to be outward opening (photo courtesy of Geoff Lowe) |
![]() |
Terry & Konnor painting the bookshelves (photo courtesy of Geoff Lowe) |
![]() |
Colin & Martin adjusting the fit of the door (photo courtesy of Geoff Lowe) |
No comments:
Post a Comment