Among other deliveries, a steel bar, which Ian & Steve carry to the shed, for HC 38 |
Steve guiding Ian in moving M2's 3'6" gauge tender chassis to stand on loose bullhead rails on their side in the four foot |
Steve unhitching the steam crane boiler, which we moved to the side of MH shed |
No comments:
Post a Comment