| Ian starting to cut fibre glass mesh for use as pit covers |
![]() |
| Steve & Ian checking the invert into the man hole |
![]() |
| Steve rechecking |
![]() |
| Ian digging the trench for the field drain |
![]() |
| Ian fitting feet & checking fit of pit covers |
![]() |
| Jonny refitting No.2's LH slide bars |
![]() |
| Steve following Ian's trench ..... |
![]() |
| ..... to check the depth for the drain |
![]() |
| Dave levelling pea gravel in the base of the trench |
![]() |
| Brian & Steve unwinding the pipe into the trench |
![]() |
| Brian & Ian covering the pipe in pea gravel (which will duct water along & into the field drain) (photo courtesy of Dave Dixon) |
![]() |
| Ian continuing his lengthy cutting task |