Richard using AW No.2 to move locos out of the way of Twizell ..... |
![]() |
..... which is to have its cab top & tanks removed |
![]() |
Steve removing bolts fastening the cab top to the tanks |
![]() |
Ian has removed the cab top to the pipe waggon |
![]() |
Ian & Steve moving HC 38's cladding sheets out of the way |
![]() |
In a downpour, placing Twizell's RH tank on the 8 wheel bogie |
![]() |
I'm in the tank to remove the lifting eyes, which need fitting to the other tank (photo courtesy of Ian Cowan) |
![]() |
There's a snag lifting the 2nd tank |
![]() |
Freed |
![]() |
LH tank heading for the bogie, where both tanks will be repaired & prepared |
![]() |
Twizell's back in MH shed, waiting for the forthcoming return of the boiler (photo courtesy of Ian Cowan) |