| Richard & Ian moving another track panel away from the site of the new shed |
![]() |
| Richard unfastening the panel from the crane |
![]() |
| The next & last panel being lowered |
![]() |
| Martin & Steve fetching a rail for the waggonway ..... (photo courtesy of Geoff Lowe) |
![]() |
| ..... & drilling the ends (photo courtesy of Geoff Lowe) |
![]() |
| Geoff drilling a sleeper for the waggonway (photo courtesy of Geoff Lowe) |
![]() |
| Colin & Steve fitting a top rail on the chaldron waggon (photo courtesy of Geoff Lowe) |
![]() |
| Colin being assisted by Julian (photo courtesy of Geoff Lowe) |
![]() |
| Terry, Colin & Dave cutting materials for ..... (photo courtesy of Geoff Lowe) |
![]() |
| ..... & working in Pontop Canteen |
![]() |
| Ian starting to remove & break up a reinforced concrete slab ..... |
![]() |
| ..... which is in the way of the new shed |
![]() |
| The slab has 20mm steel bar along the edges, hence its strength (photo courtesy of Richard Charlton) |
![]() |
| I'm moving the sections, which will need further breaking up (photo courtesy of Richard Charlton) |
![]() |
| Tidying up the immediate area (photo courtesy of Richard Charlton) |