Richard & Ian moving another track panel away from the site of the new shed |
![]() |
Richard unfastening the panel from the crane |
![]() |
The next & last panel being lowered |
![]() |
Martin & Steve fetching a rail for the waggonway ..... (photo courtesy of Geoff Lowe) |
![]() |
..... & drilling the ends (photo courtesy of Geoff Lowe) |
![]() |
Geoff drilling a sleeper for the waggonway (photo courtesy of Geoff Lowe) |
![]() |
Colin & Steve fitting a top rail on the chaldron waggon (photo courtesy of Geoff Lowe) |
![]() |
Colin being assisted by Julian (photo courtesy of Geoff Lowe) |
![]() |
Terry, Colin & Dave cutting materials for ..... (photo courtesy of Geoff Lowe) |
![]() |
..... & working in Pontop Canteen |
![]() |
Ian starting to remove & break up a reinforced concrete slab ..... |
![]() |
..... which is in the way of the new shed |
![]() |
The slab has 20mm steel bar along the edges, hence its strength (photo courtesy of Richard Charlton) |
![]() |
I'm moving the sections, which will need further breaking up (photo courtesy of Richard Charlton) |
![]() |
Tidying up the immediate area (photo courtesy of Richard Charlton) |