Wednesday 30/9

Alan fitting hand rails in MH carriage shed toilets
(photo courtesy of Geoff Lowe)
Dave fitting a light switch in a container .....
..... & Roger doing likewise
Martin & Luke fitting a post in front of MH carriage shed
(photo courtesy of Geoff Lowe)
Ian preparing an inspection chamber .....
(note the 8" steel pipe still in the way)
..... for fitting in the drainage of the new shed
Ian lifting away a severed section of steel pipe
Ian starting to .....
..... restore the ground over the drain run
Colin & Steve cleaning up the woodwork shop after their work