Search this blog

Wednesday, 18 April 2012

General Work

The cold and wet weather later today meant that several smaller jobs were tackled rather than larger scale work outside.   For example shunting carriages ready for the Light Railway weekend, adjusting carriage brakes, and checking and adjusting point rodding from the signalbox.   Some other jobs are depicted below.

Vic trying to improve the surface in the stocking ground
Vic improving the surface in the stocking ground
Following Ronnie and Brian's work yesterday, Ian opening the clam on the loading bucket
Following Ronnie and Brian's work,
Ian opening the loading bucket clam .....
..... then using it to coal No.6 ready for the weekend
Geoff has been coaling, watering and adding kindling to locos ready for the Light Railway weekend
Geoff has been coaling, watering and adding kindling
to locos ready for the Light Railway weekend
John continues to inspect, maintain and record details of electrical systems
John continues to inspect, maintain and record 
details of electrical systems