Search this blog

Tuesday, 9 October 2012

East Tanfield Station, again

Roof trusses for East Tanfield pass over Causey bridges
Vic continues flailing lineside vegetation
At East Tanfield, another panel being fitted .....
..... to the section which will become the toilet area
Test fitting the final panel, which will be fixed last
after trusses are installed
Steve, John and Rob working on the wall plate .....
..... assisted by Bill and Malcolm
The first roof truss being placed .....
..... and braced
Rob cutting 'birds mouth' joints in the ends
of the trusses to seat on the wall plates
Bill and Malcolm fitting side panels around the doorways
A double truss being positioned - these are to take
extra weight across the bays
Steve bracing the trusses
Steve and Ian temporarily fitting another truss
Malcolm 'likes' East Tanfield station
A view from above - courtesy of Ian Cowan