| Roof trusses for East Tanfield pass over Causey bridges |
![]() |
| Vic continues flailing lineside vegetation |
![]() |
| At East Tanfield, another panel being fitted ..... |
![]() |
| ..... to the section which will become the toilet area |
![]() |
| Test fitting the final panel, which will be fixed last after trusses are installed |
![]() |
| Steve, John and Rob working on the wall plate ..... |
![]() |
| ..... assisted by Bill and Malcolm |
![]() |
| The first roof truss being placed ..... |
![]() |
| ..... and braced |
![]() |
| Rob cutting 'birds mouth' joints in the ends of the trusses to seat on the wall plates |
![]() |
| Bill and Malcolm fitting side panels around the doorways |
![]() |
| A double truss being positioned - these are to take extra weight across the bays |
![]() |
| Steve bracing the trusses |
![]() |
| Steve and Ian temporarily fitting another truss |
![]() |
| Malcolm 'likes' East Tanfield station |
![]() |
| A view from above - courtesy of Ian Cowan |