Roof trusses for East Tanfield pass over Causey bridges |
Vic continues flailing lineside vegetation |
At East Tanfield, another panel being fitted ..... |
..... to the section which will become the toilet area |
Test fitting the final panel, which will be fixed last after trusses are installed |
Steve, John and Rob working on the wall plate ..... |
..... assisted by Bill and Malcolm |
The first roof truss being placed ..... |
..... and braced |
Rob cutting 'birds mouth' joints in the ends of the trusses to seat on the wall plates |
Bill and Malcolm fitting side panels around the doorways |
A double truss being positioned - these are to take extra weight across the bays |
Steve bracing the trusses |
Steve and Ian temporarily fitting another truss |