![]() |
| Malcolm & Richard assist in dropping off Vic for trackbed levelling on East Tanfield bank |
![]() |
| Peter using wire wool on the previous coat before applying another coat of varnish to HL No.2 |
![]() |
| Ronnie making a bearing extractor |
![]() |
| Track panels passing Causey |
![]() |
| Nigel slinging the 30' CS1 panels |
![]() |
| Malcolm, Nigel, John and Richard connect panels |
![]() |
| Vic working on the trackbed (Ian earlier removed wooden sleepers and placed 60' rails at the side) |






