![]() |
Malcolm & Richard assist in dropping off Vic for trackbed levelling on East Tanfield bank |
![]() |
Peter using wire wool on the previous coat before applying another coat of varnish to HL No.2 |
![]() |
Ronnie making a bearing extractor |
![]() |
Track panels passing Causey |
![]() |
Nigel slinging the 30' CS1 panels |
![]() |
Malcolm, Nigel, John and Richard connect panels |
![]() |
Vic working on the trackbed (Ian earlier removed wooden sleepers and placed 60' rails at the side) |