| Graham checking the thickness of Twizell's firebox ..... (inspection by Graham Morris Engineering, 07734560802) |
![]() |
| ..... with Ian watching |
![]() |
| Twizell has passed cold inspection, so Ian reinstalls the firebar... |
![]() |
| ..... and Dave chops wood to test steam the locos |
![]() |
| Dave checking hydraulic track jacks |
![]() |
| Rob testing electrical equipment |
![]() |
| Graham hammer testing stays in No.2's firebox ..... |
![]() |
| ..... and visually checking the safety valves |
![]() |
| Ian replacing No.2's boiler plugs |
![]() |
| Graham checking the calibration of test pressure gauges |
![]() |
| Peter reinstalling No.2's gauge after checking |
![]() |
| Graham making a visual inspection of the Lumby vertical boiler in the belt driven workshop |
Inspection of all boilers in steam will be this Thursday