Graham checking the thickness of Twizell's firebox ..... (inspection by Graham Morris Engineering, 07734560802) |
..... with Ian watching |
Twizell has passed cold inspection, so Ian reinstalls the firebar... |
..... and Dave chops wood to test steam the locos |
Dave checking hydraulic track jacks |
Rob testing electrical equipment |
Graham hammer testing stays in No.2's firebox ..... |
..... and visually checking the safety valves |
Ian replacing No.2's boiler plugs |
Graham checking the calibration of test pressure gauges |
Peter reinstalling No.2's gauge after checking |
Graham making a visual inspection of the Lumby vertical boiler in the belt driven workshop |
Inspection of all boilers in steam will be this Thursday