| Nigel & Geoff see the works train through Causey Crossing |
| Bill, Dave & Geoff doubling up some screws ..... |
| ..... assisted by Dick |
| Ian took delivery of 200 tons of ballast this morning ..... |
| ..... & loaded about 60 tons for immediate use at ET |
| Dick & Dennis levelling ballast ..... |
| ..... along with Nigel & Bill ..... |
| ..... & Geoff & Dave |
| Nigel & Geoff dropping ballast in East Tanfield loop ..... |
| ..... & the platform road ..... |
| ..... to be spread by Peter, Dick, Dave, Bill & Dennis |
| Geoff & Nigel using the Jim Crow ..... |
| ..... to bend rail ..... |
| .....which was then cut to length ..... |
| ..... for Bill to fit as a point nose check rail |
| Ian spent most of the day spreading the old fill ..... |
| ..... to level & tidy up the site |
| Peter seeing us through Causey Crossing on the return |