Ian & Graham the boiler inspector checking Cochrane's stays
(Graham Morris Engineering, 07734560802)
![]() |
| Angela refitting plugs in HL No.2 |
At ET, Dave fitting lights & Geoff painting
![]() |
| Bob mitring trim |
![]() |
| Dennis & Dick cutting roof insulation |
Steve & Nigel adding trim to the wall panels
![]() |
| Dennis sticking jointing tape to a roof sheet |
![]() |
| A minor distraction |
![]() |
| Dave painting |
![]() |
| Ian tightening a mud hole door to squeeze new joint packing during steaming of No.2 |













No comments:
Post a Comment