John removing outside lighting from the gable |
Bill & Chris working on fixing the roof to the portal frame |
Ian trying the MIG on roof retaining brackets |
Chris bolting a bracket to a purlin; Ian arc welding a bracket to the I beam
(The portal frame is intended to keep the roof in place & in shape
while the gable, which currently does these, is dismantled.)
No comments:
Post a Comment