| Rob cleaning a point rodding compensator base ..... |
![]() |
| ..... & Dave cleaning the cranks (A compensator equalizes contraction & expansion of point rodding due to temperature) |
![]() |
| Meanwhile Dave & Nigel have dug out & unfastened crossing timbers & sleepers which need replacing to hold the compensator & reconnect No.13 point to MH box |
![]() |
| There's little space to manoeuvre sleepers out ..... |
![]() |
| ..... nor turn & remove the defective timbers |
![]() |
| The last defective timber being hauled out by Dave, Rob & Dave |
![]() |
| A replacement hardwood timber (weighing over 150kg) being dragged in |
![]() |
| Levelling the bed before fetching in a sleeper ..... |
![]() |
| ..... & fastening it down to gauge |