Dave cutting his way out of the original container |
Colin, Dave & Rob removing the cut out |
Geoff notching a door stanchion |
Chris fitting a stanchion |
Dave cutting his way into the new container |
Dave, Geoff & Colin removing the cutout |
Dave grinding the step flat; Rob is behind, arresting sparks |
Colin applying Denso tape above the doorway between the containers, to keep rain out |
Rob & Chris attaching the door frame to a sheet rail |
Chris bolting down the frame |
Dave & Colin reattaching a wall panel bearer |