![]() |
| Dave cutting his way out of the original container |
![]() |
| Colin, Dave & Rob removing the cut out |
![]() |
| Geoff notching a door stanchion |
![]() |
| Chris fitting a stanchion |
![]() |
| Dave cutting his way into the new container |
![]() |
| Dave, Geoff & Colin removing the cutout |
![]() |
| Dave grinding the step flat; Rob is behind, arresting sparks |
![]() |
| Colin applying Denso tape above the doorway between the containers, to keep rain out |
![]() |
| Rob & Chris attaching the door frame to a sheet rail |
![]() |
| Chris bolting down the frame |
![]() |
| Dave & Colin reattaching a wall panel bearer |










