![]() |
Rob, Steve & Dave listening & looking for a reported air leak on AW No.2 |
![]() |
Ian cutting more of the 1 in 5.5 crossing for East Tanfield carriage shed |
![]() |
Dave dressing the end of a rail |
![]() |
Dave & Steve assembling the old crossing as a double check |
![]() |
Later, drilling rails in Marley Hill platform road to fit missing bolts |
![]() |
Steve & Rob refitting fishplates with extra bolts |
No comments:
Post a Comment