Kevin sawing jointing for the platform sections |
Steve & Dave sorting out reinforcement |
Concrete arrives |
Kevin, Steve, Dave & Ian filling a former |
Still shovelling into the first former |
Adding the first layer of reinforcement |
Ian & Dave filling the second former as Kevin & Steve continue with the first |
Reinforcement going in |
Kevin vibrating air from the concrete |
Topping off the second former |
Steve levelling the top as Kevin tidies up |
No.60 has arrived at East Tanfield |
The move of the loco is being recorded for TV |
Filming the owner chatting to Ian & Matthew |
Dave filming the offloading ramp being assembled |
The TV cameraman doing the same |
No. 60 on the ramp ..... |
..... & nearly on TR |
View from the Planet as we head to pick up the loco |
As Dave washes the dumper, No.60 is ready to head for Marley Hill |
Ramp disassembly ..... |
..... with the digger helping to load ramp rails |
Thompson's loader reversing out of East Tanfield site |
In depth interview |
Matthew oiling the loco at Causey, on its way to Marley Hill |
Three austerities in Marley Hill shed |
Bobby patching the ballast waggon |
Matthew the strimmer |