| Kevin sawing jointing for the platform sections |
![]() |
| Steve & Dave sorting out reinforcement |
![]() |
| Concrete arrives |
![]() |
| Kevin, Steve, Dave & Ian filling a former |
![]() |
| Still shovelling into the first former |
![]() |
| Adding the first layer of reinforcement |
![]() |
| Ian & Dave filling the second former as Kevin & Steve continue with the first |
![]() |
| Reinforcement going in |
![]() |
| Kevin vibrating air from the concrete |
![]() |
| Topping off the second former |
![]() |
| Steve levelling the top as Kevin tidies up |
![]() |
| No.60 has arrived at East Tanfield |
![]() |
| The move of the loco is being recorded for TV |
![]() |
| Filming the owner chatting to Ian & Matthew |
![]() |
| Dave filming the offloading ramp being assembled |
![]() |
| The TV cameraman doing the same |
![]() |
| No. 60 on the ramp ..... |
![]() |
| ..... & nearly on TR |
![]() |
| View from the Planet as we head to pick up the loco |
![]() |
| As Dave washes the dumper, No.60 is ready to head for Marley Hill |
![]() |
| Ramp disassembly ..... |
![]() |
| ..... with the digger helping to load ramp rails |
![]() |
| Thompson's loader reversing out of East Tanfield site |
![]() |
| In depth interview |
![]() |
| Matthew oiling the loco at Causey, on its way to Marley Hill |
![]() |
| Three austerities in Marley Hill shed |
![]() |
| Bobby patching the ballast waggon |
![]() |
| Matthew the strimmer |