Nigel, Ian & Steve fitting shuttering - in the distance, the van waits to be picked up |
Geoff sealing the surface gaps between the platform blocks |
More concrete has arrived |
The mixer driver looks on |
Levelling concrete in the second former, ready ...... |
...... to insert reinforcement mesh |
Nigel topping up |
Dave vibrating air out of the concrete |
Steve levelling the back |
Nigel washing the dumper bucket |
Thompson's have arrived to pick up the van ..... |
...... which is being chained down for its journey to Alnwick |
At Marley Hill, Tom is sealing bare wood on the sliding door for the van which is under repair |
Removing the site fencing as we progress up the platform |
Nigel operating the whacker plate to smooth the platform fill (photo courtesy of Geoff Lowe) |
Part of the platform surface is ready for the public, but the main platform is not yet ready for trains (photo courtesy of Geoff Lowe) |