Work Continued

Jim cleaning the miller bed .....
..... doing a job for Brian .....
..... & checking the side run out of the last of the slidebats for HC No.38
Geoff painting around the sign at te front of MH site
(photo courtesy of Geoff Lowe)
Ian, me & Colin setting up point rodding around No.8
(photo courtesy of Dave Dixon)
Dave & Colin fitting a steady tie between timber ends
I'm trying to ream out a hole with a drill .....
(photo courtesy of Dave Dixon)
..... as is Colin
(photo courtesy of Dave Dixon)
Bolting down a crank
(photo courtesy of Dave Dixon)
Dave fitting the last couple of steady ties
Ballasting ends of timbers & tidying up .....
..... with a guest appearance by Peter
Ian checking & cleaning the the interlocking trays in MH signalbox
(photo courtesy of Dave Dixon)