![]() |
| Ian drawing out the rope to fasten onto 813 ..... |
![]() |
| ..... to winch it up onto the loader ..... |
![]() |
| ..... before dismantling the ramp |
![]() |
| Connecting the tractor unit onto the trailer |
![]() |
| Backing out across Tanfield Lane, then off to Beamish |
![]() |
| Antony & David doing a lot of shunting (No. 18 is being steamed to go to ET) |
![]() |
| The loader is back & the ramp being built |
![]() |
| No. 18 won't quite make it up the ramp ..... |
![]() |
| ..... so the winch rope is attached |
![]() |
| Getting there through a smokescreen ..... |
![]() |
| ..... due to a fuel fault on the winch engine |
![]() |
| Dismantling the ramp |
![]() |
| Returning to Beamish |













No comments:
Post a Comment