Ian placing a temporary wheelset in front of the carriage shed |
Lifting carriage No.8 to remove a wheelset to be worked on |
Bowling the wheelset out |
The horn guides were found to have face plates too wide for the temporary axleboxes |
No.8 back on its original wheels, Ian slings the temporary for removal |
Tom checking measurements for HC 38 |
Jim & Mick setting up one of HC 38's axleboxes ..... |
..... on the miller |
Tom sanding 38's frames |
Malcolm filling depressions in 38's frames |
Ian lifting the 4 wheel bogie into place |
Lifting the PMV to remove an axle for No.8 |
Slinging the axle |
Lowering so that the horn guides sit on the bogie |