Continuing from yesterday |
![]() |
Dave having his dumper filled |
![]() |
Ian filling the larger dumper while Steve uses the laser level to check heights |
![]() |
One dumper load ..... |
![]() |
..... after another |
![]() |
Ian & Cameron making shuttering for the welcome hut base |
![]() |
Steve manning Causey Level Crossing |
![]() |
No.6 being taken onto the higher level loading siding |
![]() |
Richard & Ian start to build the loading ramp with help from Ian & digger |
![]() |
Ian & David helping to pack up the loading ramp |
![]() |
Pushing No.6 part way up the ramp |
![]() |
Richard taking the carriage up the ramp onto the bed using the rope winch ..... |
![]() |
..... with Ian & Ian watching progress |
![]() |
Dismantling the ramp ..... |
![]() |
..... & loading components |
![]() |
Taking the New Holland digger from ET ..... |
![]() |
..... & dropping it off at Causey Bankwell House |