Steve & Dave picking concrete from the side of a rail |
Ian replacing a brake hose on the forklift |
Colin cutting wainscot for the welcome building |
Rob checking wiring on a vacuum cleaner |
Dave & Ian removing the track to the wheel lathe |
Tom & David discussing HC 38 with the boiler inspector, who is in the firebox |
David & Tom assisting Peter in setting Horden's safety valves |
Richard & Jonny refitting plugs after a successful cold boiler inspection |
Ian breaking up more of MH engine shed floor |
Finding that more of the pit wall is loose |
Steve removing loose render from the shed wall |
Dave cleaning more rail |
Removing rubble |
Jonny & Richard filling 49's water tank after a successful steam test |
No comments:
Post a Comment