Dave, Steve, Dennis & Cameron at work on MH shed floor |
Ian & Ian placing a section of angle as a divider between concrete & cable duct |
Dennis checking the depth for concrete |
Geoff painting in the welcome hut (photo courtesy of Geoff Lowe) |
Steve chiselling a hole through which a duct will cross the shed |
Ian pecking away more of the old damaged concrete floor of the shed ..... |
..... & shovelling it away |
Geoff preparing to treat planking (photo courtesy of Geoff Lowe) |
Dave drilling a brace (photo courtesy of Geoff Lowe) |
..... with which he & Ian brace shuttering |
Cameron assisting in the woodwork shop (photo courtesy of Geoff Lowe) |
Geoff painting a noticeboard (photo courtesy of Geoff Lowe) |
Dennis & Steve removing concrete from the web of a rail |
Dennis installing a duct inside which cabling will cross the shed |
Kyle painting the running plate of the Fowler diesel |