![]() |
| Mick sawing a groove in the head of a screw made by Jim for HC38 |
![]() |
| Jim making a drilling guide |
![]() |
| The concrete has arrived |
![]() |
| Dave & Ian ready for a dumper load of concrete to be gently tipped |
![]() |
| Cameron forming a joint |
![]() |
| Ian floating a section of floor |
![]() |
| Cameron clearing a check rail gap |
![]() |
| Initial cleaning up |
![]() |
| Cameron & Steve cleaning rails |
![]() |
| Steve cleaning the pit wall |
![]() |
| Ian floating another section |











No comments:
Post a Comment