| George positioning a waggon ..... |
| ..... so that Ian can lift off the water tank |
| George reduced to hacksaw because power tools cannot get in to remove pipework |
| Ian machining an arbour for the Stihl saw ..... |
| ..... with which he removes an end from the water tank |
| Dennis fitting a bolt to limit movement of the yard gate at East Tanfield (photo courtesy of Geoff Lowe) |
| Colin repairing the 'sentry box' at ET (photo courtesy of Geoff Lowe) |
| Geoff, Colin, Dave & Dennis moving the box under cover |
| I'm fitting an new float valve to ET water tank (photo courtesy of Dave Dixon) |
| Swapping carriages ready for Sunday's party booking |
| Jonny stripping HL No.2's boiler |
| Terry replacing boards in poor condition on AH bridge ..... (photo courtesy of Geoff Lowe) |
| ..... alongside Bill (photo courtesy of Geoff Lowe) |
| Colin working on AH tearoom entrance (photo courtesy of Geoff Lowe) |
| Ian clearing the floor ..... (photo courtesy of Dave Dixon) |
| ..... & Dennis the duct channel prior to concreting over (photo courtesy of Dave Dixon) |
No comments:
Post a Comment