East Tanfield Development

First pour of the day arrives to make the finished
concrete floor surface inside the station building
The concrete is roughly levelled using shovels,
then a 5 metre vibrating float is used
Showing the overall area, with insulation sandwiching
a gas & waterproof membrane under the new concrete
(these layers sit on top of the concrete foundations)
The float takes a bit of hauling by
Bill, Geoff and John, with Ian levelling
Meanwhile, Vic eases access to the car park