![]() |
Vic flailing trackside growth at East Tanfield |
![]() |
Ian inspecting the delivery |
![]() |
The team (John, Ian, Les and Bill) smoothing out the first finished floor panel |
![]() |
Finishing float from Ian |
Afterwards, back at the shed:
![]() |
Rob and Bill fitting the last large window in the Husky |