![]() |
| Vic flailing trackside growth at East Tanfield |
![]() |
| Ian inspecting the delivery |
![]() |
| The team (John, Ian, Les and Bill) smoothing out the first finished floor panel |
![]() |
| Finishing float from Ian |
Afterwards, back at the shed:
![]() |
| Rob and Bill fitting the last large window in the Husky |




