| Ian removing sleepers & reducing the bed |
![]() |
| Dave, Bill, Steve & Nigel removing a length from the run round loop to accommodate the resited point |
![]() |
| Geoff, Nigel & Dave remove another length |
![]() |
| Moving the run round loop rail out of the way |
![]() |
| Replacing crossing timbers ..... |
![]() |
| ..... in the resited loop point |
![]() |
| The loop point has been moved south of the bay point, which gives a larger radius curve into East Tanfield |
![]() |
| Ian reducing the bed ..... |
![]() |
| ..... and giving a hand with the heavier crossing timbers |
![]() |
| Peter fishplating |
![]() |
| Replacing rail through the point - we aim to reconnect through the station to the off loading headshunt asap |
![]() |
| Setting out the CS1s through East Tanfield station ..... |
![]() |
| ..... before running out of sleepers for the day |