Ian removing sleepers & reducing the bed |
Dave, Bill, Steve & Nigel removing a length from the run round loop to accommodate the resited point |
Geoff, Nigel & Dave remove another length |
Moving the run round loop rail out of the way |
Replacing crossing timbers ..... |
..... in the resited loop point |
The loop point has been moved south of the bay point, which gives a larger radius curve into East Tanfield |
Ian reducing the bed ..... |
..... and giving a hand with the heavier crossing timbers |
Peter fishplating |
Replacing rail through the point - we aim to reconnect through the station to the off loading headshunt asap |
Setting out the CS1s through East Tanfield station ..... |
..... before running out of sleepers for the day |