The photos below were taken yesterday at East Tanfield, courtesy of Dave Dixon:
Geoff, Dave, Bob, Bill & Nigel happily go keying |
Ian moving the CS1 sleepers ..... |
..... so that the chairs line up ..... |
..... which makes the rail drop in more easily, helped by Nigel & Bob |
Ian cutting a rail, so that Dave & Nigel can drop in the last one
Bill & Nigel connecting Sunniside to ET loop .... |
.... with John & Bob doing likewise (NB ET platform road & loop need renewing) |
The realigned curve at East Tanfield requires ballasting |
Digging out ballast to add an old bridge beam as a retaining rail on Houghwell Burn bridge
The photos above were taken yesterday at East Tanfield, courtesy of Dave Dixon