![]() |
Walter making pins for point rodding at ET |
![]() |
Steve on the works train passing Causey Level Crossing |
![]() |
An NER 5 compartment carriage body arriving at ET |
![]() |
Ian filling the ballast waggon |
John clearing & closing the doors after we've emptied the ballast,
ready for another load
![]() |
Tom, John, Steve & John digging a hole ..... |
![]() |
..... for the base for the point rodding cranks |
![]() |
John refitting fishplate bolts to enable them to be removed after a check rail has been installed |
No comments:
Post a Comment