Dennis, Dave, John & Geoff removing screws from the loop south point |
Ian & a fitter replacing a burst hose on the fork lift |
Removing tie bars |
The view southwards - the headshunt will also be moved |
Dave on the impact wrench, nearest the camera |
Preparing the switches to be lifted out |
Nigel & Dennis unscrewing the point lever |
Bait time, & Bob finds another creature in his bait box (it was a mouse last week)
Aligning sleepers, to be able to insert rail |
The rails are in, & being trimmed to length (AW No.2 is the first loco in the loop for a while) |
Bob & Nigel drill a rail end (Bill the drill was AWL) |
Aligning the next set of sleepers |
Turning another rail into the chairs |
Bob & Geoff keying |
Ian has cleared the point area of wood & metal |
Bob & Nigel at Causey Level Crossing on the return |
No comments:
Post a Comment