Brian checking a suspension link for Horden, & working on a Gardner engine
Geoff, Dave & Colin unfastening defective timbers in Marley Hill yard point |
The three timbers have been removed |
Dave pushing the first replacement into place |
Colin adjusting a timber
Removing ballast to better align a timber |
The sun comes out as we start to fasten down the crossing |
Colin shovel packing as Dave & Geoff gauge & drill the last leg |
Colin screwing down chairs as Dave clears the work area |
Levelling the ballast |
Dave tidying as Geoff & Colin reinstall a check rail (with new chairs) |
Dave measuring No.6's boiler, which is due to leave for repair |
No comments:
Post a Comment