![]() |
| Steve lets the works train through Causey Crossing |
![]() |
| Steve, Dave, Rob & Bill unload the bogie |
![]() |
| I'm cutting a rail to length |
![]() |
| Steve & Bill drilling the rail ends |
![]() |
| Bill & Rob unloading wing rails for the crossing being disassembled by Steve |
![]() |
| Ian moving rail out of the way |
![]() |
| Contractors digging foundations for the new carriage shed |
![]() |
| Check chairs being fitted |
![]() |
| Steve & Rob rebuilding a crossing |
![]() |
| Fishplating a reference length |
![]() |
| Fitting a special chair |











No comments:
Post a Comment