Works train passing over Causey Level Crossing on the way to East Tanfield |
Bill, Rob & Dave freeing a couple of 60' rails ..... |
..... which Ian lifts out with the digger |
Dave, Bill & Steve remove a tie bar from a switch which is to be moved |
Lifting in a check rail section for the first point nose |
Conflab over a joint |
Rob removing the chains ..... |
..... so that timbers can be lifted from the waggon ..... |
..... & laid out on the platform |
Rob & Bill drilling .... |
& fishplating ..... |
..... the first point off the main |
Dave & Steve aligning timbers ..... |
..... & setting out chairs |
Ian removing excess ballast ..... |
..... from the work area |
Reseating some platform copings |
Bill & Rob aligning & plating the diamond crossing |