Nigel tipping ballast into the cess alongside ET carriage shed ..... |
![]() |
... which Dave, George, Bill, Steve & Kevin level out |
![]() |
Steve, Bill & George left on the task |
![]() |
Nigel tipping ballast the length of the shed ..... |
![]() |
..... to be levelled out |
![]() |
George, Bill & Steve unfastening a heavily worn rail |
![]() |
Nigel lending a hand to remove it |
![]() |
The replacement must be bent into the chairs, because this is a curved closure rail |
![]() |
Bending the rail into the chairs to facilitate keying |
![]() |
Fishplating & drilling |
![]() |
Geoff taking pride in his crossing gates (photo courtesy of Geoff Lowe) |
![]() |
Drilling and improving fishplating on the headshunt closure |
![]() |
Ian loading ballast ...... |
![]() |
...... to be dropped for future lifting of the point in the bay |
![]() |
Ian welding pipework for the water tank |