![]() |
Dennis strimming the bankside edge down to Marley Hill shed |
![]() |
Geoff priming planks for No.7 |
![]() |
Ian testing his jacker packer |
Dave removing cables which span Marley Hill shed
Following satisfactory cold boiler inspection, Richard refitting a mud hole door ..... (photo courtesy of Angela Pickering) |
![]() |
.... & Jonny refitting plugs on 49 |
![]() |
Boiler inspector Graham checking firebox orifices ..... (inspection by Graham Morris Engineering, 07734560802) |
![]() |
..... & fittings on Cochrane |
![]() |
Angela refitting plugs after a Cochrane's satisfactory cold boiler examination |
![]() |
Working in Cochrane's cab |
![]() |
Meanwhile at Andrews House, a wall is being pieced back together |
![]() |
Steve pointing |
![]() |
Steve & Trevor pointing further up AH station bank wall |
![]() |
George relaying loose stonework on the path down to MH engine shed |
![]() |
Trevor ..... |
![]() |
..... & Nigel pointing the parapet wall on Gibraltar Bridge |
![]() |
Casting a patch in the platform edge at AH |
![]() |
More bankside stone wall repairs |
![]() |
Bill topping up the crane's Gardner engine coolant |
![]() |
Angela slinging a test weight on the crane |
![]() |
Cochrane raising steam & 49 blowing off outside MH shed - checking before tomorrow's steam test |
![]() |
Angela firing Cochrane |
![]() |
The current Tanfield passenger loco fleet |
No comments:
Post a Comment