Today's Work

Dennis strimming the bankside edge down to Marley Hill shed
Geoff priming planks for No.7
Ian testing his jacker packer
Dave removing cables which span Marley Hill shed

Following satisfactory cold boiler inspection, Richard refitting a mud hole door .....
(photo courtesy of Angela Pickering)
.... & Jonny refitting plugs on 49
Boiler inspector Graham checking firebox orifices .....
(inspection by Graham Morris Engineering, 07734560802)
..... & fittings on Cochrane
Angela refitting plugs after a Cochrane's satisfactory cold boiler examination
Working in Cochrane's cab
Meanwhile at Andrews House, a wall is being pieced back together
Steve pointing
Steve & Trevor pointing further up AH station bank wall
George relaying loose stonework on the path down to MH engine shed
Trevor .....
..... & Nigel pointing the parapet wall on  Gibraltar Bridge
Casting a patch in the platform edge at AH
More bankside stone wall repairs
Bill topping up the crane's Gardner engine coolant
Angela slinging a test weight on the crane
Cochrane raising steam & 49 blowing off outside MH shed - checking before tomorrow's steam test
Angela firing Cochrane