![]() |
Dave tightening fishplate bolts |
![]() |
Dave, Trevor & Bill shovel packing |
![]() |
More shovel packing (photo courtesy of Bill Thain) |
![]() |
Ian loading more ballast |
![]() |
Ian & Steve dropping ballast |
![]() |
Once the centre door is opened, the waggon must be propelled at a steady pace |
![]() |
Trevor watches Dave fit a helicoil on the tool ..... |
![]() |
..... then screws the helicoil into the old hole |
![]() |
The fixing of the track screw is rejuvenated |
![]() |
More track screws being fitted in helicoiled holes, before lifting or packing |
![]() |
Steve tightening fishplates (photo courtesy of Bill Thain) |
![]() |
Steve, Bill, Dennis & Trevor shovel packing a flat bottom panel to a better height for connecting to a bull head panel |
![]() |
George & Ian setting up the direction indicator (photo courtesy of Bill Thain) |
![]() |
Figuring out the connection to the blades & locking bar |
![]() |
Geoff cleaning the platform floor in the carriage shed |
![]() |
More packing ..... |
![]() |
..... with the aid of the muscleman (photo courtesy of Bill Thain) |
![]() |
Dennis & Ian reattaching a sleeper to the rail |
![]() |
Packing on the incline |
![]() |
Spreading ballast along the incline |
No comments:
Post a Comment