Search this blog

Wednesday, 1 May 2019

Tanfield Track

Dave tightening fishplate bolts
Dave, Trevor & Bill shovel packing
More shovel packing
(photo courtesy of Bill Thain)
Ian loading more ballast
Ian & Steve dropping ballast
Once the centre door is opened, the waggon
must be propelled at a steady pace
Trevor watches Dave fit a helicoil on the tool .....
..... then screws the helicoil into the old hole
The fixing of the track screw is rejuvenated
More track screws being fitted in helicoiled holes, before lifting or packing
Steve tightening fishplates
(photo courtesy of Bill Thain)
Steve, Bill, Dennis & Trevor shovel packing a flat bottom panel
to a better height for connecting to a bull head panel
George & Ian setting up the direction indicator
(photo courtesy of Bill Thain)
Figuring out the connection to the blades & locking bar
Geoff cleaning the platform floor in the carriage shed
More packing .....
..... with the aid of the muscleman
(photo courtesy of Bill Thain)
Dennis & Ian reattaching a sleeper to the rail
Packing on the incline
Spreading ballast along the incline

No comments: