Dave tightening fishplate bolts |
Dave, Trevor & Bill shovel packing |
More shovel packing (photo courtesy of Bill Thain) |
Ian loading more ballast |
Ian & Steve dropping ballast |
Once the centre door is opened, the waggon must be propelled at a steady pace |
Trevor watches Dave fit a helicoil on the tool ..... |
..... then screws the helicoil into the old hole |
The fixing of the track screw is rejuvenated |
More track screws being fitted in helicoiled holes, before lifting or packing |
Steve tightening fishplates (photo courtesy of Bill Thain) |
Steve, Bill, Dennis & Trevor shovel packing a flat bottom panel to a better height for connecting to a bull head panel |
George & Ian setting up the direction indicator (photo courtesy of Bill Thain) |
Figuring out the connection to the blades & locking bar |
Geoff cleaning the platform floor in the carriage shed |
More packing ..... |
..... with the aid of the muscleman (photo courtesy of Bill Thain) |
Dennis & Ian reattaching a sleeper to the rail |
Packing on the incline |
Spreading ballast along the incline |
No comments:
Post a Comment