![]() |
| Ian & I discussing lifting No.2's cab (photo courtesy of Dave Dixon) |
![]() |
| Checking the 3-point lift ..... |
![]() |
| ..... from its temporary home on HC 38's frames |
![]() |
| Ian & Ian bringing the cab to the back of the workshop (photo courtesy of Dave Dixon) |
![]() |
| Preparing to place the cab ..... (photo courtesy of Dave Dixon) |
![]() |
| .....back on the loco frames, with Richard guiding |
![]() |
| HC 38's repaired bunker being swung round ..... (photo courtesy of Dave Dixon) |
![]() |
| ..... & positioned by Ian, Steve & Dave on the loco frames |
![]() |
| Steve holding onto No.2's water tank ..... (photo courtesy of Dave Dixon) |
![]() |
| ..... & Ian taking delivery ..... (photo courtesy of Dave Dixon) |
![]() |
| ..... & positioning the tank above the dome ..... (photo courtesy of Dave Dixon) |
![]() |
| .....to be settled into position on the boiler (photo courtesy of Dave Dixon) |
![]() |
| Ian pushing No.2 back into the workshop, where assembly will be completed |
![]() |
| Ian leading HC 38's frames back into the shed |














No comments:
Post a Comment