![]() |
Ian & I discussing lifting No.2's cab (photo courtesy of Dave Dixon) |
![]() |
Checking the 3-point lift ..... |
![]() |
..... from its temporary home on HC 38's frames |
![]() |
Ian & Ian bringing the cab to the back of the workshop (photo courtesy of Dave Dixon) |
![]() |
Preparing to place the cab ..... (photo courtesy of Dave Dixon) |
![]() |
.....back on the loco frames, with Richard guiding |
![]() |
HC 38's repaired bunker being swung round ..... (photo courtesy of Dave Dixon) |
![]() |
..... & positioned by Ian, Steve & Dave on the loco frames |
![]() |
Steve holding onto No.2's water tank ..... (photo courtesy of Dave Dixon) |
![]() |
..... & Ian taking delivery ..... (photo courtesy of Dave Dixon) |
![]() |
..... & positioning the tank above the dome ..... (photo courtesy of Dave Dixon) |
![]() |
.....to be settled into position on the boiler (photo courtesy of Dave Dixon) |
![]() |
Ian pushing No.2 back into the workshop, where assembly will be completed |
![]() |
Ian leading HC 38's frames back into the shed |
No comments:
Post a Comment