![]() |
| Jonny cutting a section from No.6's inner firebox showing grooving at the foundation ring |
![]() |
| Another section shows cracking from the rivets around the firehole door |
![]() |
| Before scrapping, retrieving an example of a girder stay from the top of the firebox |
![]() |
| John & Dave rerouting electrical cable as part of rationalising wiring in MH shed |
![]() |
| Dave assisting with shunting using No.2 in MH yard |





No comments:
Post a Comment