Dave & Dave moving a chute down the shed - a fairly tight fit under the trusses |
Ian & Ian installing the collar through the roof sheets (photo courtesy of Angela Pickering) |
Dave guiding the lift as Dave & Barry steer the tube through the collar |
The view from the Andrews House branch as ..... |
..... flashing sheets are installed (photo courtesy of Angela Pickering) |
Diassembling the top in order to move the access tower |
Dave & Barry cutting short chute extensions |
Angela cleaning threads on a sealing collar |
Hat installation & ...... |
..... the view along the SE roof pitch |
Caption competition? |
Dave & Barry screwing sections together |
More collaring ..... |
..... & assembly - the joints are a tight fit |
The main tube is standard spiral ducting, all other components are bespoke (photo courtesy of Angela Pickering) |
Express collar delivery ..... |
..... for the other side of the roof |
Fitting another chute in place inside the shed |
Preparing the way to lift the last chute assembly through the collar & roof (photo courtesy of Angela Pickering) |
Barry & Dave on the tower, Ian guiding me on the forklift (photo courtesy of Angela Pickering) |
Slow, steady, guided progress (photo courtesy of Angela Pickering) |
Vertical supports are hooked bars under the skirt, stayed to purlins, augmented by clamping to horizontal stays (photo courtesy of Angela Pickering) |
Barry & Dave clamping |
The six chutes in place, pending final alignment & repainting inside the shed, plus staying capping, flashing, sealing & repainting outside (photo courtesy of Angela Pickering) |
Info: MH shed door lintels 13'8", chutes 13'3", austerity chimney 12'2" approx above rail