Peter & Eric discussing the gap between Twizell's new door & smokebox ring, which is reducing the vacuum & hence the blast & efficiency of the loco |
Eric grinding the ring to improve the closure |
Peter checking for high spots with a straight edge |
Peter revising some design work |
Ian making an alteration to trackwork measurements for the new shed to better accommodate possible future changes to MH station |
Colin popped in to discuss with Peter changes to the chaldron framing joints |
Richard doing a spot of cleaning before Saturday's HRA visit |
Peter doing the same |
No comments:
Post a Comment